The East Sac County Community School District hired FEH Design to assist with the master planning of the district’s buildings, which involved consolidating from four buildings to two. After conducting a thorough study of various options, it was determined that the high school required the addition of seven classrooms, a kitchen, and a commons area. This addition allowed the district to accommodate more grades in the high school building, making it a junior high and high school building. Additionally, this move helped address accessibility issues present in the original 1900s building. The junior/high school now exudes a great sense of Raider pride, both inside and outside.
MEP ENGINEER KCL Engineering / CIVIL ENGINEER Beck Engineering / GENERAL CONTRACTOR Badding Construction / PHOTOGRAPHY Diesel Pictures